Back to photostream

66032 propelling the second portion of 6Y08, from Tolworth Sdgs, onto the loading pad at Cliffe, for loading with aggregate. 07 08 2025

For anyone not familiar with the location, it's near Gravesend, Kent and only a mile away from the Thames, with it's own jetty for Dredgers to deliver dredged aggregate. This is transported to the wash & grading plant by a conveyor.

 

There is a run round loop / reception siding behind the camera. The loco runs around the train of empties and then propels it into the loading area, nine wagons on each of road four & five, as seen in the image.

 

Wagons can also be loaded by the overhead conveyor to the left, on roads one & two, but both the conveyor and trackwork was undergoing maintenance when we visited.

608 views
38 faves
2 comments
Uploaded on May 21, 2026
Taken on August 7, 2025