Stanhope and Tyne Railway scenes - 3. Crawleyside.
One of the earliest railways of the North East was the The Stanhope and Tyne. It was constructed in 1834 to transport limestone from the quarries above Stanhope in Weardale and coal from the various collieries in North Durham to South Shields. The line crossed sparsely populated high ground using a number of rope hauled inclines.
The line was built without an act of Parliament and instead paid wayleaves to landowners. These bankrupted the line by 1840. The section east of Consett was formed into a new company (The Pontop and South Shields Railway) and the section to the west was taken over by the Derwent Iron Company who wanted the supply of ore and limestone for their ironworks at Consett.
Another well known early railway company, The Stockton and Darlington railway built an extension from their line to Crook which linked to the S&T near Burnhill and Waskerley and had taken over the western section of the route by 1845.
The S&D replaced many of the inclines although those leading down to Stanhope remained until they closed in 1951. The truncated route to Weatherhill finally closing as late as 1969.
The main photo here shows the line looking back up towards Weatherhill, and the insets show another S&D boundary stone, and the Hog Hill tunnel through which the line passed on it's way towards the quarries of Lanehead, just above Stanhope.
21st March 2020.
Stanhope and Tyne Railway scenes - 3. Crawleyside.
One of the earliest railways of the North East was the The Stanhope and Tyne. It was constructed in 1834 to transport limestone from the quarries above Stanhope in Weardale and coal from the various collieries in North Durham to South Shields. The line crossed sparsely populated high ground using a number of rope hauled inclines.
The line was built without an act of Parliament and instead paid wayleaves to landowners. These bankrupted the line by 1840. The section east of Consett was formed into a new company (The Pontop and South Shields Railway) and the section to the west was taken over by the Derwent Iron Company who wanted the supply of ore and limestone for their ironworks at Consett.
Another well known early railway company, The Stockton and Darlington railway built an extension from their line to Crook which linked to the S&T near Burnhill and Waskerley and had taken over the western section of the route by 1845.
The S&D replaced many of the inclines although those leading down to Stanhope remained until they closed in 1951. The truncated route to Weatherhill finally closing as late as 1969.
The main photo here shows the line looking back up towards Weatherhill, and the insets show another S&D boundary stone, and the Hog Hill tunnel through which the line passed on it's way towards the quarries of Lanehead, just above Stanhope.
21st March 2020.