The Penang Hill Railway was initially constructed for the British colonial community to enjoy the cooler air of the Penang Hill. The first attempt at a mountain railway began with a proposal by three British residents, D Logan, Joseph Heim and Alan Wilson and the formation of a private company in 1897, with funding from the colonial administration. This first attempt used a steam engine and was not funicular, and it proved to be a failure.
In 1909, the Straits government organised a new project, the Penang Hills Funicular Railway. This was designed by Arnold R Johnson, an engineer with the Federated Malay States Railways, based on a Swiss design. Construction of the second railway cost 1.5 million Straits dollars. The 2,007m long funicular railway was informally opened on 21 October 1923 for the commencement of a trial operation. After a successful trial period, on 1 January 1924, the railway was officially opened by the then Governor of Straits Settlement, Sir L N Guillemard. In its first year of operation it carried 35,201 passengers and made 4,021 trips. The Penang Municipality, George Town managed and maintained the railway from its opening until 1 February 1977, when it was taken over by the Penang state Government.
Until 2010, the Penang Hills Funicular Railway had two independent sections due to the difference in gradient between the lower and upper section, and passengers were required to change train in the middle station. The upper and lower sections each had two counterbalanced 40-passenger cars, and each section had a passing loop in the middle and intermediate stops] The cars were pulled by steel cable electrically driven with 500 volts power. The railway has a tunnel which measures 258 feet long and is the steepest tunnel in the world. It took 30 minutes to go up the hill on the funicular service with a change of train in the middle station.
The view above has been scanned from a slide taken by a relative. It would appear to be near the top of the upper section of the railway.
On 22 February 2010, the 87-year-old funicular railway was closed for an upgrade to a new system at a cost of RM63 million. New tracks were laid, and new cars purchased to increase the passenger capacity and the speed of the train. A new base station and a public carpark was also constructed. The timber from the old railway track was re-used in the construction of a new four-storey Penang Hill Visitor Centre at the top.
The new train and railway does not require passengers to change trains halfway up. There is now a non-stop service in new blue and white, air-conditioned Swiss-made cars which are capable of ferrying up to 100 passengers at one go. The maximum working load has been set at 7,500 kg, meaning the railway can carry 1,000 passengers per hour compared to 250 under the old system. The upgrade led to a large increase in passengers carried; in 2014, the number of passengers reached 1.365 million. - all facts from Wikipedia.
Penang Hill Funicular Railway, 1971
The Penang Hill Railway was initially constructed for the British colonial community to enjoy the cooler air of the Penang Hill. The first attempt at a mountain railway began with a proposal by three British residents, D Logan, Joseph Heim and Alan Wilson and the formation of a private company in 1897, with funding from the colonial administration. This first attempt used a steam engine and was not funicular, and it proved to be a failure.
In 1909, the Straits government organised a new project, the Penang Hills Funicular Railway. This was designed by Arnold R Johnson, an engineer with the Federated Malay States Railways, based on a Swiss design. Construction of the second railway cost 1.5 million Straits dollars. The 2,007m long funicular railway was informally opened on 21 October 1923 for the commencement of a trial operation. After a successful trial period, on 1 January 1924, the railway was officially opened by the then Governor of Straits Settlement, Sir L N Guillemard. In its first year of operation it carried 35,201 passengers and made 4,021 trips. The Penang Municipality, George Town managed and maintained the railway from its opening until 1 February 1977, when it was taken over by the Penang state Government.
Until 2010, the Penang Hills Funicular Railway had two independent sections due to the difference in gradient between the lower and upper section, and passengers were required to change train in the middle station. The upper and lower sections each had two counterbalanced 40-passenger cars, and each section had a passing loop in the middle and intermediate stops] The cars were pulled by steel cable electrically driven with 500 volts power. The railway has a tunnel which measures 258 feet long and is the steepest tunnel in the world. It took 30 minutes to go up the hill on the funicular service with a change of train in the middle station.
The view above has been scanned from a slide taken by a relative. It would appear to be near the top of the upper section of the railway.
On 22 February 2010, the 87-year-old funicular railway was closed for an upgrade to a new system at a cost of RM63 million. New tracks were laid, and new cars purchased to increase the passenger capacity and the speed of the train. A new base station and a public carpark was also constructed. The timber from the old railway track was re-used in the construction of a new four-storey Penang Hill Visitor Centre at the top.
The new train and railway does not require passengers to change trains halfway up. There is now a non-stop service in new blue and white, air-conditioned Swiss-made cars which are capable of ferrying up to 100 passengers at one go. The maximum working load has been set at 7,500 kg, meaning the railway can carry 1,000 passengers per hour compared to 250 under the old system. The upgrade led to a large increase in passengers carried; in 2014, the number of passengers reached 1.365 million. - all facts from Wikipedia.