ASSEMBLING BLADE, PENNY HILL WIND FARM, S YORKSHIRE
The third blade is lifted into position for attachment to the hub whilst on the ground at tower (mast) No. 3. which is the one closest to the main deilvery gates on Penny Hill Lane. The next stage is to lift the whole blade assembly up to the top of the tower.
You can see the roof of the control building on Brampton Lane on the right.
Please don't use this image on websites, blogs or other media without my explicit permission.
© Roger A Perriss. All rights reserved.
_DSC0957XR Q P3
ASSEMBLING BLADE, PENNY HILL WIND FARM, S YORKSHIRE
The third blade is lifted into position for attachment to the hub whilst on the ground at tower (mast) No. 3. which is the one closest to the main deilvery gates on Penny Hill Lane. The next stage is to lift the whole blade assembly up to the top of the tower.
You can see the roof of the control building on Brampton Lane on the right.
Please don't use this image on websites, blogs or other media without my explicit permission.
© Roger A Perriss. All rights reserved.
_DSC0957XR Q P3