Back to photostream

Finishing Up the Job

In May 2009 we recognized a persistent drainage problem at the Fayetteville Road Trailhead in Durham. We installed a 10' drain just above the connector trail leading down to the ATT.

1,392 views
0 faves
0 comments
Uploaded on April 16, 2011
Taken on May 1, 2009