Bob Passmore ( steamie bob )
Hunslet Austerity 0-6-0ST No.WD198 - Royal Engineer
12th June 2013
It was a miserable day on the Island and today the the festival goers to The Isle of Wight Festival started to arrive on the Island.Tomorrow looks better little rain though force 8 winds lets hope the tents are secure and the weather improves for the Weekend.
The car park at Havenstreet has been reserved as a contingency car park for the Festival if required.
Work is being done on Royal Engineer on the blind side to the pipe that feeds the water to the injector.
The ash pan in the foreground belongs to Freshwater W8 requires a bit of patching and welding.
Hunslet Austerity 0-6-0ST No.WD198 - Royal Engineer
12th June 2013
It was a miserable day on the Island and today the the festival goers to The Isle of Wight Festival started to arrive on the Island.Tomorrow looks better little rain though force 8 winds lets hope the tents are secure and the weather improves for the Weekend.
The car park at Havenstreet has been reserved as a contingency car park for the Festival if required.
Work is being done on Royal Engineer on the blind side to the pipe that feeds the water to the injector.
The ash pan in the foreground belongs to Freshwater W8 requires a bit of patching and welding.