Back to photostream

Watch Out

Jones (right) helps the drill operator position an auger inside the hole, which sits just inches between a water main and a sewer line. "That's why we are being so touchy with this one," says Pentimone (left). Once the drilling is done, Jones will file a request for information with McHugh. Then, upon the structural engineer's approval, the new caisson topping will be doweled and epoxied to the base.

184 views
1 fave
0 comments
Uploaded on June 14, 2007
Taken on June 6, 2007