Traim Room Build Pt. 2
The Train Room is now taking shape. There was once a single car garage door toward right, it is now walled off (just sold the roll up garage door and hardware on Letgo to a guy from Oswego for $90). The new wall skeleton wall is now visible in the foreground. The 3 car garage is becoming a 2 car with a train room.
994
views
2
faves
1
comment
Uploaded on December 9, 2017
Taken on November 30, 2017
Traim Room Build Pt. 2
The Train Room is now taking shape. There was once a single car garage door toward right, it is now walled off (just sold the roll up garage door and hardware on Letgo to a guy from Oswego for $90). The new wall skeleton wall is now visible in the foreground. The 3 car garage is becoming a 2 car with a train room.