Flooring grows
Mid-installation of the Forbo Marmoleum, with the range and fridge not yet in place. Note the mallet on top of the empty boxes of floor tiles.
312
views
0
faves
0
comments
Uploaded on May 26, 2009
Taken on May 25, 2009
Flooring grows
Mid-installation of the Forbo Marmoleum, with the range and fridge not yet in place. Note the mallet on top of the empty boxes of floor tiles.
312
views
0
faves
0
comments
Uploaded on May 26, 2009
Taken on May 25, 2009