Back to photostream

Electrical Panels

These panels will be removed and relocated to the "airlock". The wall section behind them will be removed, and the doorway bricked up. To the left is a closeup of the cutting done to prepare for the office windows.

174 views
0 faves
0 comments
Uploaded on March 30, 2006
Taken on March 30, 2006