bgh6363
bgh6363
The Morning of the Execution
The dam in the distance, next to the small brick powerhouse, was being removed later that morning, while the even older dam in the foreground was to remain. The huge backhoe used to remove the dam is poised next to the powerhouse, waiting at the ready to carry out the execution.
4x5, 150mm Schneider Xenar lens, Ilford Delta 100, f32 @ 1 sec, rear rise, front tilt
631
views
0
faves
2
comments
Uploaded on September 1, 2009
Taken on August 31, 2009
The Morning of the Execution
The dam in the distance, next to the small brick powerhouse, was being removed later that morning, while the even older dam in the foreground was to remain. The huge backhoe used to remove the dam is poised next to the powerhouse, waiting at the ready to carry out the execution.
4x5, 150mm Schneider Xenar lens, Ilford Delta 100, f32 @ 1 sec, rear rise, front tilt
631
views
0
faves
2
comments
Uploaded on September 1, 2009
Taken on August 31, 2009