Central Electricity Board of the Federation of Malaya - Cameron Highlands Hydro-Electric Scheme : brochure, c1960 : map of public electricity supplies in Malaya 1958 - 9
A folder issued by the Central Electricity Board of the Federation of Malaya in 1960 to describe works on the massive Cameron Highlands Hydro-Electric Scheme that utilised the Rivers Bertam and Telom in the highlands of Perak and Pahang. The scheme involved the long tunnels at Telom and Bertam that centred on the new dam at Ringlet Falls and allowed the construction of two power stations at Habu and Jor. This huge scheme had been first conceived in the 1930s but the outbreak of war, the Japanese invasion of Malaya in 1941 and the post-war "Emergency" slowed progress. Finally work started in 1959 and the scheme was formally opened in 1963.
The Board (Lembaga Letrik Pusat) had been formed in 1949 and it took control, over time, of the various Government, municipal and private generating stations and supply undertakings in the Peninsula. The Board's major undertakings were the development of a National Grid to link the country's network, the Connaught Bridge, new stations such as at Melaka (Malacca) and these works at Cameron Highlands. This scheme provided over 100MW to the nation's electricity output and took 110 miles (175km) of new transmission towers to link it.
The CEB became, in 1965, the national Electricity Board (Lembaga Letrik Negara ) and was privatised in 1988 as Tenaga Nasional Berhad. The folder opens to this fine map of the public electricity supplies of Malaya showing the location and type of generating stations, the transmission lines and intended developments. As can be seen as well as the CEB several municipalities still ran their own stations and supply areas most notably Penang and the still associated Singapore. Many of the 'standalone' generating stations were oil engine operated. The vast majority of generation and supply was on the West Coast with few and limited stations and supply in Kelantan, Trengganu and Pahang.
Central Electricity Board of the Federation of Malaya - Cameron Highlands Hydro-Electric Scheme : brochure, c1960 : map of public electricity supplies in Malaya 1958 - 9
A folder issued by the Central Electricity Board of the Federation of Malaya in 1960 to describe works on the massive Cameron Highlands Hydro-Electric Scheme that utilised the Rivers Bertam and Telom in the highlands of Perak and Pahang. The scheme involved the long tunnels at Telom and Bertam that centred on the new dam at Ringlet Falls and allowed the construction of two power stations at Habu and Jor. This huge scheme had been first conceived in the 1930s but the outbreak of war, the Japanese invasion of Malaya in 1941 and the post-war "Emergency" slowed progress. Finally work started in 1959 and the scheme was formally opened in 1963.
The Board (Lembaga Letrik Pusat) had been formed in 1949 and it took control, over time, of the various Government, municipal and private generating stations and supply undertakings in the Peninsula. The Board's major undertakings were the development of a National Grid to link the country's network, the Connaught Bridge, new stations such as at Melaka (Malacca) and these works at Cameron Highlands. This scheme provided over 100MW to the nation's electricity output and took 110 miles (175km) of new transmission towers to link it.
The CEB became, in 1965, the national Electricity Board (Lembaga Letrik Negara ) and was privatised in 1988 as Tenaga Nasional Berhad. The folder opens to this fine map of the public electricity supplies of Malaya showing the location and type of generating stations, the transmission lines and intended developments. As can be seen as well as the CEB several municipalities still ran their own stations and supply areas most notably Penang and the still associated Singapore. Many of the 'standalone' generating stations were oil engine operated. The vast majority of generation and supply was on the West Coast with few and limited stations and supply in Kelantan, Trengganu and Pahang.