E50275 + E50280 March.
On a very dark January 26th 1983, Metro-Cammell power twin E50275 + E50280 loads up at March whilst working the 10.38 Doncaster - Cambridge. It was unusual to see a power twin set in East Anglia and this one was based at Leeds Neville Hill depot. Two months earlier these services had been diverted via Peterborough following closure of the joint line from March to Spalding. Slide scan 2/83 011 replaced with higher res scan 30/5/13.
E50275 + E50280 March.
On a very dark January 26th 1983, Metro-Cammell power twin E50275 + E50280 loads up at March whilst working the 10.38 Doncaster - Cambridge. It was unusual to see a power twin set in East Anglia and this one was based at Leeds Neville Hill depot. Two months earlier these services had been diverted via Peterborough following closure of the joint line from March to Spalding. Slide scan 2/83 011 replaced with higher res scan 30/5/13.