Back to photostream

Master Loft- In progress 1

This is the view of the master loft from the bathroom door. The insulation is done, sheetrock is up & textured, walls are painted, and lights are install.

 

Window is still old. And the panel to cover the new furnace still needs to be built.

48 views
0 faves
0 comments
Uploaded on December 8, 2008
Taken on May 24, 2006