Back to photostream

MR1-transition-1

The transition section still needed to be put together. It had to be epoxied to a 1" length of Qunatum tubing that would recieve the nose cone. I scruffed up the plastic with sandpaper and the epoxied it into place.

65 views
0 faves
0 comments
Uploaded on February 3, 2009
Taken on February 2, 2009