With trenches dug and lined with geofabric, rebar cages are added and concrete is placed. The workers use a vibrating poker to assist compaction and the levels are checked.
Being a restricted site, the mixer transfers to a small bucket on a piece of plant, for pouring. I haven't seen it done that way before.