Temporary
MAN010 leading MAN002, MAN006 ahead of 9375 cooling their heels at the temporary crew change platform at Junee after a non-stop run from Wollongongs Inner Harbour. The platform has been constructed to avoid trains blocking the Olympic hwy level crossing which is currently the only railway crossing in town due to the Kemp St bridge being closed due to reconstruction works for the Inland Rail. Down train crews no longer changeover at the station platform.
Temporary
MAN010 leading MAN002, MAN006 ahead of 9375 cooling their heels at the temporary crew change platform at Junee after a non-stop run from Wollongongs Inner Harbour. The platform has been constructed to avoid trains blocking the Olympic hwy level crossing which is currently the only railway crossing in town due to the Kemp St bridge being closed due to reconstruction works for the Inland Rail. Down train crews no longer changeover at the station platform.