Back to photostream

Photo_021909_001

The body of the crane is too heavy and wide to have the tracks assembled. Each track is one trailer load. The main crane can assemble itself. Hydraulic jacks are lowered from a low boy trailer and then the trailer moves off. The lower section is driven under the unloaded upper section and then this trailer is driven off.

83 views
0 faves
0 comments
Uploaded on February 22, 2009
Taken on February 19, 2009