Exiting the Poe Lock
Indiana Harbor exits the Poe Lock downbound on August 2, 2015 as the Alpena and PRT wait their turn. On the left is the de-watered MacArthur Lock undergoing inspection and repair, making the Soo Locks a congestion point for a few weeks.
1,278
views
7
faves
2
comments
Uploaded on August 27, 2015
Taken on August 2, 2015
Exiting the Poe Lock
Indiana Harbor exits the Poe Lock downbound on August 2, 2015 as the Alpena and PRT wait their turn. On the left is the de-watered MacArthur Lock undergoing inspection and repair, making the Soo Locks a congestion point for a few weeks.
1,278
views
7
faves
2
comments
Uploaded on August 27, 2015
Taken on August 2, 2015