BIF Rig May 2012
Last tweaks to the BIF Rig to improve Beam Triggering Stability..
the Detector and Laser now sit on a much more rigid box section frame - I now get a solid 255 count from the beam even if the frame or support is moved...
The detector had been fitted into a tube with deep red filter and a long "snout" to basically remove the effect of ambient light level changes...
The Beam height is adjustable over approximately 150mm
Just waiting for the rest of the BnS heads and a few more YN 560 II's from YN...
Peter...
BIF Rig May 2012
Last tweaks to the BIF Rig to improve Beam Triggering Stability..
the Detector and Laser now sit on a much more rigid box section frame - I now get a solid 255 count from the beam even if the frame or support is moved...
The detector had been fitted into a tube with deep red filter and a long "snout" to basically remove the effect of ambient light level changes...
The Beam height is adjustable over approximately 150mm
Just waiting for the rest of the BnS heads and a few more YN 560 II's from YN...
Peter...