Back to photostream

BIF Rig May 2012

Last tweaks to the BIF Rig to improve Beam Triggering Stability..

 

the Detector and Laser now sit on a much more rigid box section frame - I now get a solid 255 count from the beam even if the frame or support is moved...

 

The detector had been fitted into a tube with deep red filter and a long "snout" to basically remove the effect of ambient light level changes...

 

The Beam height is adjustable over approximately 150mm

 

Just waiting for the rest of the BnS heads and a few more YN 560 II's from YN...

 

Peter...

 

671 views
6 faves
4 comments
Uploaded on May 23, 2012
Taken on May 23, 2012