Cadia Valley Mine
The Cadia East Project is the largest underground mine in Australia and one of the largest underground gold mines in the world. An essential part of ensuring the safe development of this project has been the use of fibre-reinforced shotcrete (Sprayed Concrete). Situated 260 kilometres west of Sydney, Australia the Cadia project is the latest mine to be developed by Newcrest Mining Limited who are the largest gold producer listed on the Australian Stock Exchange. Cadia East has an approved mine life of 21 years and is forecast to increase Cadia Valley Operations (CVO) annual production to 700,000 to 800,000 oz (20,000 to 23,000 kg) of gold and 99,000 tons (90,000 tonnes) of copper in the coming years. In the financial year ending June 2013, CVO produced 446,879 oz (12,669 kg) of gold and 59,440 tons (53,912 tonnes) of copper.
Fiber-reinforced shotcrete is an integral part of ground reinforcement and support at Cadia East. It is considered essential for safe mining development and has become the accepted standard for underground personnel when dealing with existing and induced stresses.
EPC has been supplying BarChip synthetic fibre reinforcement to Newcrest’s
Cadia Valley operation since they first took the journey underground. The
high durability and low cost application of BarChip structural fibres help
ensure Newcrest stay in the lowest quartile of the global construction cost
curve.
Quick facts
•Will produce gold bullion and gold/copper concentrate
•30+ year design life
•Development cost of A$1.91 billion
•Or body up to 2.5 km long, 600 m wide and 1.9 km underground
•Australia’s first underground panel cave mine
•Will be the deepest panel cave mine in the world and Australia’s largest underground mine
•Resources of 2,347 Mt, with 33.2 Moz of gold, 6.59 Mt of copper
•Reserves of 18.7 Moz of gold and 3.16 Mt of copper
•Planned processing capacity of 26 Mtpa
•Total Cadia Valley operations will ramp up to 700 to 800 koz of gold and in excess of 100 kt of copper
•Initially mining will extend from 500 m to approximately 1,450 m below the surface
•Reinforced with BarChip structural synthetic fibres
Cadia Valley Mine
The Cadia East Project is the largest underground mine in Australia and one of the largest underground gold mines in the world. An essential part of ensuring the safe development of this project has been the use of fibre-reinforced shotcrete (Sprayed Concrete). Situated 260 kilometres west of Sydney, Australia the Cadia project is the latest mine to be developed by Newcrest Mining Limited who are the largest gold producer listed on the Australian Stock Exchange. Cadia East has an approved mine life of 21 years and is forecast to increase Cadia Valley Operations (CVO) annual production to 700,000 to 800,000 oz (20,000 to 23,000 kg) of gold and 99,000 tons (90,000 tonnes) of copper in the coming years. In the financial year ending June 2013, CVO produced 446,879 oz (12,669 kg) of gold and 59,440 tons (53,912 tonnes) of copper.
Fiber-reinforced shotcrete is an integral part of ground reinforcement and support at Cadia East. It is considered essential for safe mining development and has become the accepted standard for underground personnel when dealing with existing and induced stresses.
EPC has been supplying BarChip synthetic fibre reinforcement to Newcrest’s
Cadia Valley operation since they first took the journey underground. The
high durability and low cost application of BarChip structural fibres help
ensure Newcrest stay in the lowest quartile of the global construction cost
curve.
Quick facts
•Will produce gold bullion and gold/copper concentrate
•30+ year design life
•Development cost of A$1.91 billion
•Or body up to 2.5 km long, 600 m wide and 1.9 km underground
•Australia’s first underground panel cave mine
•Will be the deepest panel cave mine in the world and Australia’s largest underground mine
•Resources of 2,347 Mt, with 33.2 Moz of gold, 6.59 Mt of copper
•Reserves of 18.7 Moz of gold and 3.16 Mt of copper
•Planned processing capacity of 26 Mtpa
•Total Cadia Valley operations will ramp up to 700 to 800 koz of gold and in excess of 100 kt of copper
•Initially mining will extend from 500 m to approximately 1,450 m below the surface
•Reinforced with BarChip structural synthetic fibres