The I-5 Ship Canal noise study panels
Contractor crews have finished installing about 350 of the noise-absorptive panels on the east side of the I-5 Ship Canal bridge.
The panels stretch about 500 feet on the south end of the structure. They are not over the travel lanes. Instead, they are securely fastened to the outside ceiling of the express lanes.
Learn more about this project: www.wsdot.wa.gov/projects/i5/shipcanalbridge/
The I-5 Ship Canal noise study panels
Contractor crews have finished installing about 350 of the noise-absorptive panels on the east side of the I-5 Ship Canal bridge.
The panels stretch about 500 feet on the south end of the structure. They are not over the travel lanes. Instead, they are securely fastened to the outside ceiling of the express lanes.
Learn more about this project: www.wsdot.wa.gov/projects/i5/shipcanalbridge/