Back to photostream

ISC concrete slabs placed: March 2012

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

334 views
0 faves
0 comments
Uploaded on May 1, 2012
Taken on March 30, 2012