Back to photostream

Evergreen Line Soil Mixing

A construction technique called soil mixing is being used to build the footings for the guideway by Moody Centre Station. An auger is used to mix concrete with the existing earth to create a solid foundation to support the SkyTrain guideway. This technique which can be used for ground level sections of the Evergreen line guideway reducing the need for pile driving.

 

evergreenline.gov.bc.ca/

6,661 views
3 faves
0 comments
Uploaded on February 27, 2014
Taken on February 4, 2014