We visit Rugged Radios in San Luis Obispo for a state of the art comm install
Random trucks and buggies. Feel free to use if the car is yours!
Thank you to Marsha Carlson for the use of this photo.
Photos from VORRA's Yerington 300 2011
We moved the body to the pan and got the back end attached.
21 man hours in one day
More beam work.
Larry G and Larry M.
12093
Champion of Class11: Unclassified Pattern/Stripes/Spotted
Dave Oram in his Class 9
In line for tech inspection. Did I mention it was hot?
projectbaja.com/
One of the Pilots. These things are wickedly fast.
I have no idea who this dude is
Shawn paints 1107s new body
I still have no idea who he is in profile
2008 SCORE Tecate Baja 1000
Heather off the line
Two weeks til the race
Taken July 09
A couple of shots as I clean out 1107 after the Fallon 250
Kidderminster Station Signal Box was built in 1986 and based on a typical GWR medium-sized box. The signalling equipment was installed in 1987 providing a 62 lever frame