View allAll Photos Tagged Verification
These corms did not bloom their first year so they are not mature corms. Grid is 1 cm (with one square marked in mm.)
These were planted in October 2011 and bloomed for the first time in April 2013 with slender magenta blooms.
IMG_9265
These were received as G. gracilis but when they sprouted we could tell they were not. (Actually if I had the book I have now, I would have seen these corms look nothing like G. gracilis which has woody teeth.) I do have photos of G. gracilis corms here: www.flickr.com/photos/gastils_garden/8195190152/ Those look quite distinctively different. (Those had their ID verified.)
FAST partners met together at the NERC Field Spectroscopy Facility (FSF, fsf.nerc.ac.uk/), University of Edinburgh, June 15-17 2015, to learn about field protocols, instrument care and calibration of spectroradiometers under the careful guidance of FSF's Chris MacLellan.
Regular inter-partner calibration-validation activities are a key part of the FAST projects commitment to quality assurance.
Creator: fastspaceproject (UCAM, NIOZ, UCA)
FAST partners met together at the NERC Field Spectroscopy Facility (FSF, fsf.nerc.ac.uk/), University of Edinburgh, June 15-17 2015, to learn about field protocols, instrument care and calibration of spectroradiometers under the careful guidance of FSF's Chris MacLellan.
Regular inter-partner calibration-validation activities are a key part of the FAST projects commitment to quality assurance.
Creator: fastspaceproject (UCAM, NIOZ, UCA)
Background Verification is an imperative move to protect your company from potential risks so it is important to get verification done by the best companies in India.
"free xbox gift card codes", "free xbox gift cards no survey" for you today all you have to do is watch the "free xbox gift cards no survey" video to claim your "free xbox gift card codes" then thank me later. watch more......https://www.youtube.com/playlist?list=PLGYGx1rK70WpgixwqAQeRLJ9CMjbatDVg watch next.....https://youtu.be/EgoPOqQcFSY
Verify out these china direct pictures:
Lightning strike
Image by ming1967
Waited for al least ten minutes for the air to charge up before this direct strike! F22 at 30 seconds, ISO100 EF24-105 L. Straight out of camera.
Read more about Nice China Direct photographs
(Posted by a China Sourcing Agent)
FAST partners met together at the NERC Field Spectroscopy Facility (FSF, fsf.nerc.ac.uk/), University of Edinburgh, June 15-17 2015, to learn about field protocols, instrument care and calibration of spectroradiometers under the careful guidance of FSF's Chris MacLellan.
Regular inter-partner calibration-validation activities are a key part of the FAST projects commitment to quality assurance.
Creator: fastspaceproject (UCAM, NIOZ, UCA)
Verifying (Justify) and jockey Joel Rosario win a MSW at Saratoga Racecourse 8/27/22. Trainer: Brad Cox. Owner: Magnier, Tabor, Smith, Westerberg, & Poulin
This was the seal verification log that we were to use to examine the seals on the machinery and confirm that there had been no tampering.
Ce que mangent le + les Americains :
+ burgers,
+ pizzas,
+ chips,
+ sodas, bieres,
+ viennoiserie (donuts, muffins, cookies etc)
= 400 000 deces par an dus a l'obesite !
Deputy Secretary of State Wendy Sherman visits a United Nations High Commissioner for Refugees (UNHCR) “Documentation Renewal and Information Verification Exercise (DRIVE) Center for Afghan Refugees in Islamabad, Pakistan, on October 8, 2021. [State Department Photo by Tahir Anwar/ U.S. Embassy Islamabad/Public Domain]
Item Number:6645-138-sh2-pt2
Document Title:Coe[v]/ Poultry & Duck Houses[pi]/ Head House/ Interior [orig]/; Scale 1/4" = 1' [orig]
Project:06645; Coe, William R.; Oyster Bay; NY; 07 Private Estate & Homesteads; 397;
Location:FREDERICK LAW OLMSTED NHS, BROOKLINE, MA
Category:PLAN
Purpose:A&E (Architectural & Engineering)
Physical Characteristics:20 3/4" x 31 7/8" cyano neg graphite paper
Dates:DEC-1920 [pi]; 20-DEC-1920 Rec'd OB. [pi]; 03-MAR-1921 Revised [orig]
Notes:Rec'd from Parson's & Co. / Left by Wait [pi]/Basement, First Floor Plan/ Second Floor Plan [orig] / Dimensions, Materials, Construction Notes [orig] / Directions and Additional Notes in graphite[r] Note Verify all Dimensions [orig]
Please credit: Courtesy of the United States Department of the Interior, National Park Service, Frederick Law Olmsted National Historic Site.
© 2025 Công Minh. All rights reserved.
This image and all of its visual elements are the exclusive intellectual property of Mitchell Jones and are fully protected under the United States Copyright Act (17 U.S.C. §101–§506), the Digital Millennium Copyright Act (17 U.S.C. §512), and the Berne Convention for the Protection of Literary and Artistic Works (WIPO).
Any unauthorized use, reproduction, modification, adaptation, redistribution, or public display of this image, whether in digital, print, or derivative form, is strictly prohibited and constitutes a violation of international copyright law.
Such infringement may result in civil liability for damages, statutory penalties, and criminal prosecution under applicable intellectual property statutes in both the United States and the infringer’s jurisdiction.
This work is digitally timestamped and registered with embedded EXIF and metadata identifiers to verify authorship and originality.
All legal rights, moral rights, and economic rights are reserved exclusively to the author.
For commercial licensing, editorial permissions, collaborations, or copyright inquiries, please contact:
Email: congminh.owner@proton.me
Phone: +1 (973) 322-4821
Location: Livingston, New Jersey, USA
FAST partners met together at the NERC Field Spectroscopy Facility (FSF, fsf.nerc.ac.uk/), University of Edinburgh, June 15-17 2015, to learn about field protocols, instrument care and calibration of spectroradiometers under the careful guidance of FSF's Chris MacLellan.
Regular inter-partner calibration-validation activities are a key part of the FAST projects commitment to quality assurance.
Creator: fastspaceproject (UCAM, NIOZ, UCA)
How can you help your audience go from booby-trapped pages to secure connections? confirming accounts!
To ensure a better audience experience, choose actions that prioritize cybersecurity. So, as a way of preventing fraud and protect everyone's integrity, check out the links and verified accounts on major social media platforms here: gravatar.com/raquelpimentel
Note: logos, illustrations and other graphics will generally are protected by copyright. Just because it is not customary to provide notes on this fact does not mean these contents is not protected by copyright. Please note that all these contents, from initial ideation to the final distribution, made by TELENIMA (and eTELENIMA).
There are two main variations of the logo:
- Logo variation A (without the website)
- Logo variation B (with the website)
William Shanter is now apart of the Google + verified accounts feature. Read more about verified accounts here bit.ly/pdYiEj.
Research and Survey Vessel
Built in 1989 and converted by Damen Trading of Holland for hydrographic use after being aquired by the Port of London Authority in 2001.
LOA 20.6m
Powered by twin Caterpiller 3412 TA engines of 1150 bhp
Top speed 26 knots
FAST partners met together at the NERC Field Spectroscopy Facility (FSF, fsf.nerc.ac.uk/), University of Edinburgh, June 15-17 2015, to learn about field protocols, instrument care and calibration of spectroradiometers under the careful guidance of FSF's Chris MacLellan.
Regular inter-partner calibration-validation activities are a key part of the FAST projects commitment to quality assurance.
Creator: fastspaceproject (UCAM, NIOZ, UCA)