Back to photostream

Installation of the electrical conduit inside the link bridge, which will provide a direct connection between the new parking structure and the platforms.

Installation des conduits électriques à l’intérieur de la passerelle, laquelle reliera directement le nouveau parc de stationnement et les quais.

1,066 views
0 faves
0 comments
Uploaded on June 20, 2014
Taken on May 28, 2014