joegoauk73
Dabolim Airpot
Pics taken from a moving bus
Airport 4.10.16
Flyover / overbridge project work in progress
grade separator
Foundation stone laid in February 2014 by Chief Minister Manohar Parrikar. Work started Feb 2014 and was expected to finish by December 2014 (both projects/separators by June 2016).
Cost 33.49 crores. Awarded for 41.80cr
575+485m length (2 separators before and after the airport, same road)
To ease total traffic movement towards Dabolim airport from Verna side and Vasco side. Also, to prevent present traffic congestion near traffic signal in front of airport. GSIDC
Contractor: M Venkata Rao Infra Projects Private Ltd
Dabolim Airpot
Pics taken from a moving bus
Airport 4.10.16
Flyover / overbridge project work in progress
grade separator
Foundation stone laid in February 2014 by Chief Minister Manohar Parrikar. Work started Feb 2014 and was expected to finish by December 2014 (both projects/separators by June 2016).
Cost 33.49 crores. Awarded for 41.80cr
575+485m length (2 separators before and after the airport, same road)
To ease total traffic movement towards Dabolim airport from Verna side and Vasco side. Also, to prevent present traffic congestion near traffic signal in front of airport. GSIDC
Contractor: M Venkata Rao Infra Projects Private Ltd