Benrather Strasse Station (U-Bahn)
The new Wehrhahn metro line (U-Bahn) consists of six new stations which are free of advertising, each reflecting the vision of an artist. The construction began on November 28, 2007, and the line was officially opened on February 20, 2016. Total construction cost: €843m; Length of the tunnel: 2 miles.
480
views
3
faves
0
comments
Uploaded on February 21, 2016
Taken on February 21, 2016
Benrather Strasse Station (U-Bahn)
The new Wehrhahn metro line (U-Bahn) consists of six new stations which are free of advertising, each reflecting the vision of an artist. The construction began on November 28, 2007, and the line was officially opened on February 20, 2016. Total construction cost: €843m; Length of the tunnel: 2 miles.
480
views
3
faves
0
comments
Uploaded on February 21, 2016
Taken on February 21, 2016