Central Power Electric - McLean County, ND
A small roadside substation along US 83 south of Washburn. It seems this replaced another substation that was closer to the river, as the "41.6kV" line coming towards the right picks up the outgoing 12.5kV circuit from the substation and then heads for the river.
320
views
3
faves
3
comments
Uploaded on September 17, 2021
Taken on May 24, 2012
Central Power Electric - McLean County, ND
A small roadside substation along US 83 south of Washburn. It seems this replaced another substation that was closer to the river, as the "41.6kV" line coming towards the right picks up the outgoing 12.5kV circuit from the substation and then heads for the river.
320
views
3
faves
3
comments
Uploaded on September 17, 2021
Taken on May 24, 2012