Back to photostream

QNX Cabinet Re-Dress

The original 7' Patch Cords were replaced with 14'. The (3) Cisco switches were moved to the rear of the cabinet.

139 views
0 faves
0 comments
Uploaded on September 2, 2010
Taken on September 1, 2010