Back to gallery

CPKC 4WHA-21 @ Townline Tunnel

CPKC Continuous Welded Rail train 4WHA-21 led by SD40-2F 9017 and SD40-2 6011 heads north through the Tunnel cut in Welland, ON along the Hamilton Sub after wyeing the train at CN Robbins.

924 views
55 faves
4 comments
Uploaded on March 24, 2025
Taken on March 21, 2025