Up Front
Construction, Week 19
Finally for today, a look down the front of the store from inside the current parking lot, as compared to the one from East Parkway which started today's set. You can probably see this better in that E Parkway pic, but there are considerably more holes in the wall for doors, windows, and the like on that side of the building than on the one where this pic was taken from. The ground-level openings are presumably for the café seating area per the interior layout design, but the upper ones make me think that there will be a second level here for offices. Some Krogers, including millennium ones (as we'll see in the future... ;) ), were built with second-floor offices, but Hernando's currently are all on the first (well, only) floor, I believe.
Stick around, Saturday I've got more from the Olive Branch Walmart coming your way!
(c) 2015 Retail Retell
These places are public so these photos are too, but just as I tell where they came from, I'd appreciate if you'd say who :)
Up Front
Construction, Week 19
Finally for today, a look down the front of the store from inside the current parking lot, as compared to the one from East Parkway which started today's set. You can probably see this better in that E Parkway pic, but there are considerably more holes in the wall for doors, windows, and the like on that side of the building than on the one where this pic was taken from. The ground-level openings are presumably for the café seating area per the interior layout design, but the upper ones make me think that there will be a second level here for offices. Some Krogers, including millennium ones (as we'll see in the future... ;) ), were built with second-floor offices, but Hernando's currently are all on the first (well, only) floor, I believe.
Stick around, Saturday I've got more from the Olive Branch Walmart coming your way!
(c) 2015 Retail Retell
These places are public so these photos are too, but just as I tell where they came from, I'd appreciate if you'd say who :)